Designed two beams and brick pillars to support the timber first floor above the new wall openings at ground floor level in this Afro-Carribean
Restaurant.
Director: Gregory Sills BEng (hons) CEng MIStructE FGS
Associate: Dr Barry Collings BSc (hons) PhD CEng MICE